Look Up
Identify overhead lines, service cables and anything long equipment could approach before the setup leaves the ground.
Health & Safety Resource Centre
Practical safety guidance for gutter clearing, window cleaning and other work using poles or long-reach equipment.
Check overhead electricity, the work area and your equipment before work begins. Use this guide alongside your own risk assessment, training, manufacturer instructions and current HSE or network-operator advice.
Safety & Compliance
Complete these three checks before poles, cameras, vacuums or other long equipment are unloaded or raised.
Critical Safety Reminder
Close approach to a live overhead line can cause flashover without direct contact. Where the work could be affected by overhead lines, plan the job and obtain the site-specific advice needed before starting.
Identify overhead lines, service cables and anything long equipment could approach before the setup leaves the ground.
Choose the method, work area and controls before raising long equipment or starting the task.
Reassess if weather, access, equipment, people or site conditions change the original plan.
Detailed Safety Guide
Use these five areas to frame the detailed guidance below, then follow the relevant steps wherever a risk is present.
Overhead
Look for lines, service cables and anything long equipment could approach.
Access
Check access, ground conditions, public areas, traffic and fragile surfaces.
Equipment
Inspect poles, clamps, hoses, electrical equipment, PPE and attachments before use.
Conditions
Wind, visibility and changing site conditions can alter the original plan.
Prepared
Know how to stop work, keep others clear and summon the correct emergency help.
Critical Electrical Safety
HSE says work near overhead power lines must be carefully planned to avoid accidental contact or dangerous close proximity. Treat this as a decision process, not a distance you can guess on site.
Step 1
Scan the work area and access route before unloading long equipment.
Step 2
Treat overhead lines as dangerous unless their owner has confirmed otherwise.
Step 3
Choose a method that removes or reduces the need to work near the line.
Step 4
Get the site-specific information needed before work continues.
Step 5
Keep people, equipment and the full working envelope outside the confirmed safe area.
Step 6
Reposition, reschedule or decline the work rather than forcing the job.
Safe Clearance
There is no single website number that can safely replace site-specific line information. HSE says the required safe clearance should be obtained from the owner of the line or Distribution Network Operator.
First question
Consider the full possible movement of poles, attachments, vehicles and other equipment-not only where you intend to hold them.
Confirm
Use the line owner or DNO to establish the clearance and any additional controls needed for the particular site.
Working envelope
The safe area must account for the full reach and possible movement of the equipment throughout the job.
Site control
Make sure everyone understands the controlled area and that the controls remain effective.
Emergency Response
Do not improvise. Keep people away, call the emergency services where there is danger to life, and involve the electricity network operator.
Immediate
Assume equipment, vehicles, poles and the surrounding area may be electrically dangerous.
Get help
Call 999 where there is danger to life. In Great Britain, 105 connects you to the local electricity network operator.
Do not re-enter
Keep the area controlled until the line owner or competent responders confirm it is safe.
Real Survivor Story
On 6 April 2024, window cleaner Jason Knight was working near overhead electricity lines when a 33,000-volt flashover occurred. The pole did not need to touch the line for electricity to arc across the gap.
Jason survived after extensive hospital treatment and rehabilitation. He and his family now share his story through Look Up Look Out to help other workers understand how quickly an ordinary job can become life-changing.
Jason’s story is shared with respect, focusing on recovery, awareness and helping to prevent another life-changing incident.
Look up before the pole goes up. Treat overhead lines as live, get advice where safe clearance is uncertain and stop work if the risk cannot be controlled.
Before Every Job
Turn safety information into a practical plan for the actual site, people, equipment and conditions in front of you.
Identify
Look for anything with the potential to cause harm before equipment is unloaded.
Assess
Consider the likelihood and potential severity of the harm.
Control
Choose measures that avoid or reduce risk rather than relying on PPE alone.
Review
Make sure the plan is understood and remains effective throughout the job.
Final Working Checks
Once the method is planned, use a short working checklist to keep the site and equipment under control.
Check poles, clamps, hoses, filters, cables, generators and attachments before work begins.
Do not allow long equipment to enter the electrical danger area established for the site.
Manage pedestrians, vehicles, pets, open doors, fragile surfaces and trip hazards around the job.
The person using the equipment should understand safe setup, operation, shutdown and emergency actions.
Wind, visibility, access and the position of other people can change during the task.
If equipment, conditions or the site no longer match the safe method, stop and reassess.
External Safety Campaign
Look Up Look Out shares practical overhead-line awareness and survivor stories for people using long-reach equipment.
The central message is simple: before the pole goes up, look up. If the situation does not feel safe, stop.
Before The Pole Goes Up
A short memory aid at the end of the guide. It does not replace the detailed planning above.
Choose the safe method before unloading or raising equipment.
Check overhead hazards and access routes before long equipment is used.
Make sure everyone understands the controls and emergency actions.
If the controls cannot be maintained, do not proceed.